Please ensure Javascript is enabled for purposes of website accessibility
Notice 04-30-2025 : Thank you for visiting! Our refreshed municipal website is now up and running, offering improved access to services and updates.

Contact Information

Village Bridge Steering Committee

Chairman

John Meade

Email: [email protected]

Member

Max Corbett

Member

Leslie Backstrom

Member

Kay Thompson Bailey

Member

Susan Corbett

Member

Steve Davis

Non-voting Wentworth Select Board liaison

Member

Donna King

Member

Palmer Koelb

Member

Peter Kozak

Member

Jennifer Meade

Member

Ellie Murray

Member

Francis Muzzey

Information About the Bridge

Google Maps directions to the bridge

Photo and brief history of the bridge taken from the 2013 Annual Report

Download the pages

Correspondence and Press Coverage

  • November 6, 2015 Letter from David L. Scott, In-House Design Chief, Bureau of Bridge Design, regarding a Memorandum of Agreement regarding the bridge. This letter was presented to the Select Board but not was not agreed to or signed by the Select Board. Download the letter and MOA
  • August 24, 2015 E-mail from David Scott, Project Manager of the Village Bridge project, regarding the current status of the project. Download the e-mail
  • March 17, 2015 WMUR coverage of preserving the pedestrian bridge from the Wayfarer Hotel and Convention Center to replace the Wentworth Village bridge. Link to WMUR's coverage
  • November 24, 2014 Questionnaire from Christine Perron, Senior Environmental Manager, NHDOT to the Wentworth Select Board regarding the potential impact of the project on "environmental, social, economic, or cultural resources" (questionnaire). Download the questionnaire
  • November 24, 2014 E-mail from Mark Richardson, NHDOT, to the Wentworth Select Board about the status of the bridge efforts and to address public safety concerns. Download the e-mail
  • October 28, 2014 E-mail from Mark Richardson, NHDOT, to the Wentworth Select Board about the current condition of the bridge. Download the e-mail
  • October 10, 2014 NHDOT Condition and Rating of NH Br. No. 148/121 Bypassed/Historic over Baker River In the Town of Wentworth, NH report. Download the report
  • December 13, 2013 E-mail regarding the Wentworth Common Bridge from Mark Richardson, Administrator, Bridge Design Bureau, NH Department of Transportation. Download a copy of the e-mail